An outdoor air conditioning condenser unit mounted on a concrete pad next to a blue-sided residential house at sunset.

AC Installation in Davis, CA

Tell us about the job

Takes about a minute. No obligation.

New system or replacementCentral ACYolo County, CA
Step 1 of 2

What ZIP code is the job in?

Electricity here runs 31.97 cents a kilowatt-hour

California homes paid that rate in 2024, well above what homes in most other states pay. An air conditioner that runs inefficiently costs more to run every time it's on.

The rate makes efficiency worth comparing

At this price per kilowatt-hour, the difference between a system that runs efficiently and one that doesn't shows up on every bill it's on, all season.

5 months
May through September, your air conditioner is on duty
93°F
the average summer afternoon it cools against
2 hail events
in ten years, and hail bends the fins on outdoor coils
13.4 SEER2
the federal minimum any new unit must meet
Isometric grey illustration of a cutaway single-story house showing interior rooms, ceiling ductwork connected to an indoor air handler, and an outdoor condenser unit linked by lines outside the wall.
Your air conditioner works hardest from June through September.

NOAA nClimDiv, 1991–2020 normals

Utility gas heats 59.6% of homes in Yolo County.

An AC installation here usually pairs with an existing gas furnace, not a heat pump replacing it.

May is when it starts. April is when to put the new system in.

Cooling runs May through September
Summer afternoons average 93°F
Power costs 31.97 cents a kWh statewide
Davis summers run the AC hardAfternoon highs average 93°F through June, July and August, five months of cooling every year.

Yolo County falls under climate zone 3B, with long summers and a short, mild winter. Any new split-system air conditioner installed here, under 45,000 Btu/h, has to meet 14.3 SEER2, higher than the federal floor that applies in most other states. It also has to meet a separate EER2 rating, which reflects how the system holds up on the hottest days rather than over the season as a whole. A contractor quoting a system for this county should already be working from these numbers, not the lower national minimum.

At this rate, efficiency is worth paying for upfront

Power here runs 31.97 cents a kilowatthour. A system that runs efficiently earns that back on every bill it's on, all summer. Ask any quote to show the efficiency ratings for the system before you sign.

Find a contractor
An outdoor residential air conditioning condenser unit mounted on a concrete pad, surrounded by gravel with a blue sky in the background.

Five months a year, every year

Five months of summer at 93 degrees means the system runs most of the daylight hours, day after day, from May to September. Sizing it right matters more here than in a milder climate. A unit too big short cycles and never settles into steady, efficient operation. One too small runs flat out all afternoon and still falls behind. Get a load calculation done for your house rather than a quote based on what was there before.

The old system gets disconnected, not left in place

Before anything new goes in, the refrigerant lines get disconnected and the old condenser and coil come out. If the system still has refrigerant in it, that gets recovered into a tank rather than vented, because venting refrigerant is against the law. The old unit doesn't stay as a backup. Once the lines are open, it's not functional anymore.

The pad, the lines and the electrical get checked, not assumed

A new condenser doesn't always match the footprint of the old one, so the pad underneath gets checked for level ground and enough clearance. The line set gets checked too, since reusing old refrigerant lines with a new system depends on their size and condition, not just whether they're already there. The electrical disconnect and breaker get sized for the new unit's draw, which isn't always the same as what the old one needed.

Aerial view of a square outdoor air conditioning condenser unit on a concrete pad beside a house wall with a sliding glass door.

A higher-efficiency unit would save about $40 a year to run in Yolo County compared with a new unit at the federal minimum.

  • A higher-efficiency unit$490 a year
  • A new unit at the federal minimum, 14.3 SEER2$530 a year

Estimates for a typical Yolo County home, from EIA household energy data, California fuel prices and NOAA climate normals. Your home will differ.

Install day starts with the old system coming out, so there's a stretch, usually a few hours, where the house has no cooling at all. Once the new condenser is set and the lines are connected, the system gets charged with refrigerant to the exact weight the manufacturer specifies, not just topped off until it feels cold. Low voltage wiring to the thermostat gets checked, since a new system sometimes needs a different thermostat than the one already on the wall. Before anyone leaves, the system runs through a full cycle so static pressure, airflow and refrigerant charge can be checked against what the equipment is rated for. That startup check is what catches a duct that's too restrictive or a charge that's off, while it's still easy to fix.