Electricity here runs 31.97 cents a kilowatt-hour
California homes paid that rate in 2024. Every hour the compressor runs, it runs on that rate.
Takes about a minute. No obligation.
California homes paid that rate in 2024. Every hour the compressor runs, it runs on that rate.
A new system runs for years at whatever efficiency it was built with. At this electric rate, that number keeps showing up on the bill long after installation.

NOAA nClimDiv, 1991–2020 normals
Homes here run cooling from May through October, six months straight.
Put the new system in during April and it's ready before the first hot week, not in the middle of it.




Hanford is zone 3B, and California falls under the federal Southwest region for air conditioner standards. That means a split system installed here now has to hit 14.3 SEER2 at minimum, higher than the 13.4 floor that applies in most of the rest of the country. It also has to meet a separate EER2 rating, which measures how the system holds up on the hottest afternoons rather than over an average day. A contractor quoting something below these numbers isn't offering a deal. It isn't legal to install here.
At 31.97 cents a kilowatt-hour, the efficiency of the system going in is what sets the bill for as long as it runs. That rating gets locked in at installation, not after.
Find a contractor
Six straight months of cooling puts a steady load on whatever gets installed here. Ask each contractor what size unit they're proposing and why. A unit too big for the house cycles on and off without running long enough to pull moisture out of the air. A unit too small runs flat out all afternoon and still falls behind on the hottest days. Either way, the house feels it. The right size comes from a load calculation done on this house, not a number carried over from the last job.
A straight swap, where the new unit sits where the old one sat and uses the same line set and the same electrical circuit, costs less than one where any of that has to change. New ductwork, a bigger breaker, a different refrigerant line, a condenser moved to a new pad. Each of those adds work beyond setting the equipment.
Square footage alone misses things that change how hard a house is to cool. How much shade the windows get. How many people are usually home. What sits above the ceiling. A contractor who skips the calculation is guessing, and a wrong guess costs you either way, in comfort or in the bill.
Estimates for a typical Kings County home, from EIA household energy data, California fuel prices and NOAA climate normals. Your home will differ.
Installation day starts with the old unit coming out. The line set gets disconnected, the refrigerant recovered rather than vented, and the old condenser pulled off its pad. If the new system uses the same refrigerant and the same line set, the crew moves straight to setting the new condenser and running the connections at the coil and the furnace or air handler. If it doesn't, the day gets longer. A new line set has to be run. A new pad gets poured or leveled. Sometimes a new circuit has to go in if the old breaker isn't rated for what's going in. Once the equipment is set, the system gets charged with refrigerant to the manufacturer's spec, not topped off by feel. Then it runs. A tech checks the temperature split between the air going in and the air coming out, checks static pressure in the ducts, and watches how the system cycles before calling the job done. Skip that check and a bad charge or a weak airflow problem can sit there unnoticed until a hot afternoon shows it.