An outdoor central air conditioning unit mounted on a concrete pad beside a blue-sided house at sunset.

AC Installation in Los Angeles, CA

Tell us about the job

Takes about a minute. No obligation.

New system or replacementCentral ACLos Angeles County, CA
Step 1 of 2

What ZIP code is the job in?

Electricity here runs 29.69 cents a kilowatt-hour

That is higher than what most counties in the country pay. Every hour this system runs, that rate is what it draws against.

A less efficient system costs you more, every month

At this rate, the difference between a system that runs well and one that doesn't shows up on the bill in a way it wouldn't somewhere power is cheap.

4 months
June through September, your air conditioner is on duty
87°F
the average summer afternoon it cools against
9 hail events
in ten years, and hail bends the fins on outdoor coils
13.4 SEER2
the federal minimum any new unit must meet
Isometric cutaway illustration of a single-story house with a dark shingled roof, showing interior rooms with ductwork and an indoor air handler connected to an outdoor condenser unit beside the building.
Your air conditioner works hardest from June through September.

NOAA nClimDiv, 1991–2020 normals

Cooling season in Los Angeles County runs June through September.

Get a new system in before June and it's a planned install, not an emergency swap in a heat wave.

Most homes here heat with gas, which is what the new AC install is matched against

62.6% of homes heat with gas
Climate zone 3B
Power here costs 29.69 cents per kilowatt-hour

Half the homes in Los Angeles County were built in 1965 or earlier. A house that age wasn't built with central air in mind, and whatever ductwork is up in the attic was sized for whatever system went in at some point after the fact, not necessarily the one going in now. The wrong size unit for that ductwork will short cycle or struggle to cool evenly, and either way it runs harder than it should. None of that shows up on the price tag at install. It shows up on the power bill every month after, at a rate that's already higher than most of the country pays.

The system you pick decides what every bill after this one looks like

Installing the right system is the one chance to get this right. Once it's in, that rate is what it runs against every month after. Ask about efficiency now, while it's still a choice and not a bill you're stuck with.

Find a contractor
An outdoor residential air conditioning condenser unit mounted on a concrete pad, surrounded by gravel with a blue sky in the background.

Size it to the house you have, not the one before it

A load calculation before install tells the contractor what the house actually needs, not what the old unit happened to be. If your ductwork dates back to whatever system was in before, have it checked rather than assumed. Matching the new unit to the house, not just swapping in whatever size was there, is what keeps it from running harder than it has to.

The old unit has a refrigerant charge that has to come out first

Refrigerant can't be vented to the air. A contractor recovers it from the old system with a recovery machine before any lines get disconnected or cut. That's standard practice on every removal, not an extra step tacked on for this job.

The pad and line set usually stay

If the old condenser sat on a slab or pad outside, that pad often works for the new unit too. The copper line set running to the indoor coil can sometimes be reused if it's the right diameter and in good shape, which saves tearing into walls again. A contractor checks both before assuming either has to be replaced.

An outdoor air conditioning condenser unit installed beside the exterior wall of a blue vinyl-sided house at sunset.

A higher-efficiency unit would save about $30 a year to run in Los Angeles County compared with a new unit at the federal minimum.

  • A higher-efficiency unit$450 a year
  • A new unit at the federal minimum, 14.3 SEER2$480 a year

Estimates for a typical Los Angeles County home, from EIA household energy data, California fuel prices and NOAA climate normals. Your home will differ.

Install day starts with the old system coming out and ends with the new one running, usually the same day unless ductwork needs rework. The indoor coil and the outdoor condenser get set first, then the line set connects them and gets pressure tested before any refrigerant goes in. A contractor pulls a vacuum on the lines to clear out air and moisture, because either one left in the system will cause problems down the road. Once the vacuum holds, refrigerant gets weighed in to the amount the system calls for, not just added until it seems cold enough. The last part is startup: checking airflow at the vents, checking the temperature split between the air going in and the air coming out, and making sure the thermostat is talking to the new equipment correctly. A system that passes all of that on day one is set up to run the way it's supposed to for years.